Construction of Barge Canal: Erie, Champlain and Oswego Canals, Work Completed and Work under Contract; Cayuga and Seneca Canal, Work Completed -- Construction of Barge Canal Terminals: Work Completed and Work under Contract.
In order not to burden the text of the present volume with too great detail, the contracts under which the Barge canal and terminal construction work was performed have been listed in tabular form and are here inserted under a special chapter heading. From these tables it may be learned when the work at the various localities was undertaken and also what the cost was. There are summaries which give the total costs. It should be said that all these figures represent the cost of construction and do not include engineering, the purchase of land, awards for damages and interference with vested rights, and other incidental expenditures. The tables show that virtually all canal construction is completed, while on terminal construction, especially the installation of machinery, considerable is still under contract. The logical arrangement in the tables has seemed to be that of contract number, but since no very definite or easily-explainable system was employed in the original assignment of numbers, search for any given piece of work will have to made until it is found.
It will be seen that the total construction cost of the Erie, Champlain and Oswego branches of the Barge canal, as shown in the following tables, is $96,685,570. In 1903 is was estimated that this cost would be approximately $84,000,000, but in 1915 it was evident that this amount would be exceeded, and the reasons therefor are given ... [in chapter 10] of this volume. Since that time there have been some other extraordinary increases in cost of labor and material, brought about by World war conditions, which tended very materially to increase the total cost of the construction work above either the 1903 or the 1915 estimates.
TABLES OF CONTRACTS:
- Construction of the Barge Canal: Work completed on the Erie, Champlain and Oswego canals up to October 18, 1922, exclusive of that done under Chapter 585, Laws of 1918
- Construction of the Barge Canal: Work completed on the Erie, Champlain and Oswego canals under Chapter 585, Laws of 1918
- Work under contract but uncompleted October 18, 1922
- Total Construction cost of the Erie, Champlain and Oswego branches of the Barge Canal
- Work completed on the Cayuga and Seneca canal
- Construction of Barge Canal terminals, Work completed up to October 18, 1922, exclusive of that done under Chapter 585, Laws of 1918, Chapter 746, Laws of 1911 and amendatory laws
- Construction of Barge Canal terminals, Work completed under Chapter 585, Laws of 1918
- Work under contract but not completed October 18, 1922, Chapter 746, Laws of 1911, and supplementary laws
- Summary of cost -- Construction of Barge Canal terminals
Con- tract No. |
Canal | Description of work | Contractor | Date of contract |
Total con- struction cost, includ- ing altera- tions and extra work orders |
1 | Champlain | Northumberland to Fort Miller, and Crockers Reef to Port Edward | Empire Engineering Corporation | 4/18/05 | $479,875 |
2 | Erie | Locks 2 and 3 and prism through Waterford | The Ferguson Contracting Co. | 4/3/05 | 725,630 |
2-E | Erie | Completion of Contract 2 | Holler & Shepard | 12/8/09 | 286,135 |
2-G | Erie | Taintor gate, etc., Waterford side-cut | A.A. Parker | 10/17/16 | 11,590 |
3 | Champlain | Lock 6 and land line, Fort Miller to Crockers Reef | Sundstrom & Stratton | 4/4/05 | 688,129 |
4 | Erie | 4 3/4 miles east of Oneida lake | Empire Engineering Corporation | 4/18/05 | 732,657 |
4-B | Erie | Bridge on Burdick's road adjacent to Contract 4 | E.J. Doyle & Co. | 12/1/10 | 1,332 |
5 | Erie | Mosquito Point to Fox Ridge | Empire Engineering Corporation | 4/18/05 | 125,820 |
5-A | Erie | Completion of Contract 5 | James Stewart & Co. | 1/20/12 | 319,351 |
6 | Erie | N.Y.C.R.R. west of Rochester to South Greece | F.A. Maselli | 5/3/05 | 1,034,630 |
7 | Erie and Champlain | Superstructure of highway bridges, Contracts 2, 3, 4, 5 and 6 | The Groton Bridge Co. | 8/10/06 | 102,173 |
8 | Erie | Locks and dams at Scotia, Rotterdam and Cranesville | Pittsburgh-Eastern Co. | 5/22/06 | 920,776 |
8-A | Erie | Completion of lock and dam at Scotia | The Foundation Co. | 7/6/12 | 967,610 |
9 | Erie | Eagle Harbor to Medina | Thomas Crimmins Contracting Co. | 3/18/08 | 659,055 |
10 | Oswego | Locks and prism at Fulton | McDermott Contracting Co. | 6/7/06 | 670,379 |
10-A | Oswego | Completion of portion of Contract 10 | The T.A. Gillespie Co. | 12/14/11 | 168,583 |
10-B | Oswego | Completion of portion of Contract 10 | Oswego Construction Co., Inc. | 3/4/12 | 533,811 |
10-C | Oswego | Filling portion of old canal at Fulton | Fulton Engineering Co., Inc. | 11/18/14 | 39,904 |
11 | Erie | Locks 4, 5, and 6, guard-gate and prism, Waterford to Crescent | Fort Orange Construction Co. | 5/21/06 | 1,221,322 |
12 | Erie | Dredging, Oneida lake to Mosquito Point; Lock 23 | James Stewart & Co. | 9/23/07 | 3,105,781 |
13 | Erie | Superstructures of highway bridges, Contract 18 and part of Contract 12 | Penn Bridge Co. | 11/7/08 | 23,412 |
14 | Erie | Crescent to Rexford Flats; Mohawk river locks and dams | Acme Engineering & Contracting Co. | 9/10/07 | 2,676,042 |
14-A | Erie | Clearing lands between Crescent and Rexford Flats | John Henkes | 10/26/12 | 010 |
14-B | Erie | Completion of dams at Crescent and Vischer Ferry; removal of Crescent aqueduct | Brown & Lowe Co. | 10/29/14 | 88,169 |
14-R | Erie | Removal and reinterment of bodies in cemeteries | Thomas F. Riley | 11/28/11 | 629 |
15 | Champlain | Locks 11 and 12 and prism, Comstock to Whitehall | Atlantic Gulf & Pacific Co. | 8/9/06 | 1,388,171 |
16 | Erie and Champlain | Superstructures of highway bridges, Contracts 11, 25 and 27 | The United Construction Co. | 12/20/06 | 92,461 |
17 | Erie | Locks and dams at Amsterdam and Tribes Hill | The Scofield Co. | 12/29/06 | 53,794 |
17 | Erie | Locks and dams at Amsterdam and Tribes Hill (relet) | Alexander Murdoch | 3/3/08 | 754,269 |
18 | Erie | Lock 16, guard-gate and prism, Mindenville to Indian Castle | Kelley Bros. Contracting Co. | 1228/06 | 496,585 |
18-A | Erie | Completion of work, Mindenville and Little Falls (Contracts 18 and 20-A) | N.Y. State Dredging Corporation | 2/17/14 | 1,693,153 |
19 | Erie | Canal prism, Sulphur Springs to Tonawanda | Great Lakes Construction Co. | 11/26/06 | 825,083 |
20-A | Erie | Dredging, Mindenville to Little Falls | Houston Barnard | 8/20/09 | 321,491 |
20-B | Erie | Dredging, Canajoharie to Mindenville | S. Pearson & Son, Inc. | 8/2/09 | 1,018,359 |
20-C | Erie | Dredging, Yosts to Canajoharie | American Pipe & Construction Co. | 8/18/09 | 661,855 |
20-D | Erie | Dredging, Rexford Flats to Yosts | American Pipe & Construction Co. | 8/18/09 | 3,345,676 |
21 | Erie | Construction, Genesee river to N.Y.C.R.R. west of Rochester | Lane Bros. Co. | 4/7/10 | 949,000 |
22 | Erie | Superstructures of highway bridges, part of Contract 12 | M. Fitzgerald | 9/24/10 | 122,912 |
22-A | Erie | Substructure, etc., highway bridge at Weedsport | Lupfer & Remick | 8/8/12 | 27,870 |
23 | Erie | Locks 32 and 33 and prism, Kings Bend to Genesee river | Millard & Lupton Co. | 8/18/09 | 1,207,726 |
23-B | Erie | Completion of approaches, South Ave. bridge, Rochester | Michael E. Sweeney | 11/4/14 | 4,736 |
24 | Champlain | Guard-gate at Crockers Reef | Kingsbury Construction Co. | 11/1/11 | 43,841 |
25 | Champlain | Locks 9 and 10 and prism, Dunhams Basin to Comstock | Atlantic Gulf & Pacific Co. | 11/19/06 | 1,547,193 |
26 | Champlain | Dredging near Fort Edward | The Lake Erie Dredging Co. | 4/6/08 | 35,443 |
27 | Champlain | Locks 7 and 8 and prism, Fort Edward to Dunhams Basin | The Kinser Construction Co. | 11/23/06 | 393,535 |
27-A | Champlain | Completion of Contract 27 | Holler & Shepard | 12/1/10 | 548,764 |
27-B | Champlain | Diversion channel for Bond creek | John J. Farrell, Jr. | 5/23/16 | 6,043 |
29 | Erie | Lock 19 and prism, Sterling creek to Oneida-Herkimer Co. line | Maryland Dredging & Contracting Co. | 4/3/09 | 506,502 |
30 | Erie | Lock 18 and prism, Little Falls to Sterling creek | Acme Engineering & Contracting Co. | 7/16/09 | 2,913,187 |
30-A | Erie | Completion of work, Jacksonburg to Herkimer | Mohawk Dredge and Dock Co., Inc. | 11/24/16 | 124,461 |
31 | Erie | Lock 17, Rocky Rift dam and prism through Little Falls | Casey & Murray | 9/2/08 | 753,405 |
32 | Champlain | Needle beams, lock gates and valves, etc., Locks 6, 8 and 9 | Penn Bridge Co. | 4/19/09 | 44,375 |
33 | Erie, Champlain and Oswego | Needle beams, lock gates, guard and sluice gates, Contracts 2, 10, 11 and 15 | Penn Bridge Co. | 1/7/10 | 170,822 |
34 | Erie | Superstructure, Saratoga Ave. bridge, Waterford | M. Fitzgerald | 8/8/06 | 22,317 |
35 | Oswego | Locks 7 and 8 and prism through Oswego | Gilmour-Horton-Allen Co. | 9/16/07 | 676,101 |
36 | Erie | Operating winches for Mohawk river movable dams | J.D. Miller | 5/25/10 | 47,210 |
37 | Oswego | Locks 5 and 6 and prism, Fulton to Oswego | Henry P. Burgard | 12/9/10 | 2,609,680 |
37-R | Oswego | Removal of bodies from Minetto cemetery | Sallidin & Henrick | 11/29/12 | 3,682 |
38 | Erie | Highway bridge at Wappings, west of Fairport | Henry Tosh & Son | 1/11/09 | 16,635 |
39 | Oswego | Dredging, Three Rivers to Fulton | James Stewart & Co., Inc. | 4/15/10 | 969,803 |
40 | Erie | Lockport to Sulphur Springs guard-lock | The United Engineering & Contracting Co. | 11/27/08 | 2,113,231 |
41 | Erie | Embankment of Irondequoit creek | Butler Bros. Construction Co. | 12/5/08 | 241,741 |
42 | Erie | Lock 20 and prism, Oneida-Herkimer Co. line to Oriskany road | Shanley-Morrissey, Inc. | 7/9/09 | 478,670 |
42-A | Erie | Completion of Contract 42 | Grant Smith & Co. & Locher | 2/24/13 | 1,197,578 |
43 | Erie | Oriskany road to Mud creek | The M.A. Talbott Co. | 10/15/09 | 1,306,549 |
44 | Erie | Mud creek to east end of Contract 4 | Scott Bros. | 1/8/10 | 1,629,999 |
45 | Erie | Lock 24 and prism at Baldwinsville; dam at Caughdenoy | Scott Bros. | 5/6/08 | 419,519 |
46 | Erie | Lock 25 and prism, Fox Ridge to Seneca-Wayne Co. line | The Kinser Construction Co. | 11/23/08 | 842,689 |
46-A | Erie | Completion of Contract 46 from Fox Ridge to Montezuma aqueduct | James Stewart & Co., Inc. | 9/2/14 | 181,338 |
46-B | Erie | Completion of lock 25 | Scott Bros. | 2/25/16 | 270,974 |
47 | Erie | Lock 26 and prism, Seneca-Wayne Co. line to Lyons | The Crowell-Sherman-Stalter Co. | 11/30/08 | 833,442 |
47-A | Erie | Completion of Contract 47 | Central Dredging Co. | 3/22/16 | 193,720 |
48 | Erie | Locks 27 and 28-A and prism, Lyons to Newark | The Sherman-Stalter Co. | 12/29/10 | 1,482,999 |
49 | Erie | Lock 30 and prism, Yellow Mills bridge to Wayne-Monroe Co. line | American Pipe & Construction Co. | 2/21/10 | 797,544 |
50 | Erie | Dam and reservoir ant Hinckley on West Canada creek | The Buffalo Dredging Co. | 9/23/10 | 995,673 |
51 | Erie | Nine-Mile creek diverting dam and feeder | The Alto Construction Co. | 12/23/10 | 375,081 |
53 | Oswego | Lock 1 and prism, Phoenix | Scott Bros. | 8/16/09 | 165,689 |
54 | Champlain | Lock 7 at Fort Edward | The Hunkin-Conkey Construction Co. | 12/13/09 | 223,893 |
55 | Erie | Dam and reservoir at Delta on Mohawk river | Arthur McMullen | 10/19/08 | 884,811 |
55-R | Erie | Removal and reinterment of bodies in cemeteries | Joseph Kalk & Alfred S. Brown | 11/3/11 | 7,627 |
56 | Champlain | Improving the Glens Falls feeder | Flood & Van Wirt Co. | 9/26/12 | 333,542 |
57 | Erie | Dredging through Onondaga outlet | N.Y. State Dredging Corporation | 8/6/12 | 93,315 |
59-A | Erie | Sewers, Genesee Valley park to Court St., Rochester | P.H. Murray | 7/3/16 | 110,031 |
60 | Erie | South Greece to Adams Basin | Empire Engineering Corporation | 8/6/08 | 1,346,261 |
61 | Erie | Adams Basin to Monroe-Orleans Co. line | Cleveland & Sons Co. | 10/13/08 | 1,048,666 |
62 | Erie | Monroe-Orleans Co. line to Eagle Harbor | I.M. Ludington's Sons, Inc. | 8/11/10 | 2,854,348 |
63 | Erie | Wayne-Monroe Co. line to Kings Bend | H.S. Kerbaugh, Inc. | 6/3/10 | 2,993,209 |
64 | Erie | Medina to Gasport | Empire Engineering Corporation | 8/6/08 | 1,199,980 |
65 | Erie | Prism and structures at Medina | Maryland Dredging & Contracting Co. | 3/26/13 | 1,110,918 |
66 | Erie | Gasport to Lockport | Empire Engineering Corporation | 9/22/08 | 783,160 |
67 | Erie | Locks 33 and 34 and prism [original text says "prison"] at Lockport | Larkin & Sangster | 9/3/10 | 1,048,772 |
68 | Champlain | Locks 3, 4 and 5 and adjoining structures | Shanley-Morrissey, Inc. | 11/23/08 | 947,813 |
69 | Champlain | Lock 2 and adjoining structures | I.A. Hodge & Co., Inc. | 12/11/09 | 231,504 |
70 | Champlain | Dredging, Waterford to Lock 1 | Shanley-Morrissey, Inc. | 1/11/10 | 236,240 |
70-A | Champlain | Completion of Contract 70 | Central Dredging Co. | 10/22/12 | 798,842 |
71 | Champlain | Lock 1 and dam and dredging, Lock 1 to Lock 2 | Shanley-Morrissey, Inc. | 1/11/10 | 826,305 |
71-A | Champlain | Completion of Contract 71 | P. McGovern & Co. | 1/16/13 | 1,487,701 |
72 | Champlain | Dredging, Lock 2 to Lock 4 | Shanley-Morrissey, Inc. | 12/14/09 | 618,900 |
72-A | Champlain | Completion of contract 72 | James Stewart & Co., Inc. | 3/27/13 | 1,515,095 |
72-B | Champlain | Widening prism at mouth of Hoosic river | James Stewart & Co., Inc. | 7/7/16 | 92,517 |
73 | Champlain | Dredging, Lock 4 to Northumberland | E.M. Graves | 5/26/10 | 517,223 |
74 | Erie | Dredging Mohawk and Hudson rivers below lock 2, Waterford | Dunbar & Sullivan Dredging Co. | 2/13/14 | 215,741 |
75 | Erie | Guard-gates within limits of Contracts 60, 61 and 64 | United Construction Co. | 3/1/10 | 43,842 |
76 | Erie | Lock 28-B and prism, Newark to Port Gibson | The T.A. Gillespie Co. | 12/23/10 | 1,401,110 |
77 | Erie | Lock 29 and prism, Port Gibson to Yellow Mills | The T.A. Gillespie Co. | 12/23/10 | 1,691,466 |
78 | Oswego | Dike at Fulton | Cunningham-Woodard Co. | 4/18/10 | 50,119 |
79 | Oswego | Superstructure for highway bridge, Bridge St., Oswego | Lupfer & Remick | 9/23/10 | 34,661 |
80 | Oswego | Dam of Phoenix | Walter Bradley | 1/16/11 | 112,034 |
81 | Erie | Junction lock at Rome | Chesley, Earl & Heimbach, Inc. | 10/17/16 | 50,594 |
82 | Erie | Superstructures of highway bridges on Contract 21 | Groton Bridge Co. | 12/7/10 | 28,708 |
83 | Erie | Construction, Contract 19 to Niagara river, Tonawanda | Mohawk Dredge & Dock Co. | 10/22/17 | 164,191 |
85 | Oswego | Superstructure, lift-bridge, Bridge street, Phoenix | Lupfer & Remick | 8/5/11 | 12,339 |
86 | Erie | Bridge at Canajoharie | Lathrop, Shea & Henwood Co. | 9/23/11 | 39,164 |
87 | Erie | Lansing's bridge, Sta. 4078, Contract 20-A | The P.B. McCaghey Co. | 2/17/13 | 11,400 |
88 | Champlain | Reconstructing portion of bridge at Schuylerville | Lathrop, Shea & Henwood Co. | 11/4/11 | 30,844 |
89 | Erie | Bridges between Lyons and Palmyra, Contracts 48, 76 and 77 | Owego Bridge Co. | 5/28/12 | 56,205 |
90 | Erie, Champlain and Oswego | Power equipment, etc., Locks 24, Erie; 1,2,7,8, Oswego, and 9,11, 12, Champlain | D'Olier Engineering Co. | 4/12/10 | 178,733 |
90-A | Oswego | Power-plants, etc., at [original text has "a"] Locks 1,2,7 and 8, Oswego canal | Lupfer & Remick | 8/8/12 | 63,137 |
91 | Erie | Power-plant, east end of Crescent dam | The Holington Co. | 1/5/11 | 43,750 |
91-A | Erie | New governor equipment, Crescent power-house | Lord Construction Co. | 11/24/16 | 6,226 |
92 | Erie and Champlain | Power equipment Locks 2 to 19, incl., guard-gate above 6, Erie; 1 to 8, Champlain | MacArthur Bros. Co. & Lord Electric Co. | 2/17/13 | 1,209,394 |
93 | Erie and Oswego | Power equipment, Locks 20, 21, 22, 23 and 25, N. London junction lock, Erie; 3, 5 and 6, Oswego | MacArthur Bros. Co. & Lord Electric Co. | 8/12/13 | 364,305 |
94 | Erie | Power equipment, Locks 26, 27, 28-A, 28-B, 29, 30, 32, 33, 34, 35 and guard-locks, Erie | MacArthur Bros. Co. & Lord Electric Co. | 2/17/13 | 439,789 |
100 | Erie and Oswego | Bridges at Long Branch, Belgium and Hinmansville, Contracts 12, 39 and 57 | W.J. Burns Co. | 9/12/13 | 162,757 |
101 | Erie | Highway bridge at Three Rivers | Barrally & Ingersoll | 8/8/12 | 40,655 |
102 | Erie | Bridge superstructure at Howland's Island | Lupfer & Remick | 2/20/13 | 24,560 |
103 | Oswego | Concrete and bascule bridge at Lock St., Phoenix | Barrally & Ingersoll | 12/10/12 | 185,033 |
104 | Oswego | Reinforced concrete arch bridge at Broadway, Fulton | R.B. Murdock | 3/5/12 | 36,856 |
105 | Erie | Lift-bridges at Spencerport, Adams Basin, Brockport, Hulberton and Gasport | Skene & Richmond | 4/19/12 | 245,688 |
106 | Erie | Lift-bridges Brockport, Medina, Middleport and Lockport; and guard-gate at Gasport | The W.S. Cooper Co. | 5/13/14 | 274,268 |
107 | Erie | Lift-bridge and fixed bridge at Little Falls | Jackson L. Richmond | 2/19/13 | 115,093 |
108 | Erie | Highway bridges near Macedon and superstructures at Peeks' and Allerton's | I.M. Ludington's Sons, Inc. | 10/17/13 | 84,199 |
109 | Erie | Highway bridge at site of Crescent aqueduct | Larkin & Sangster | 7/31/14 | 151,371 |
110 | Erie | Highway bridges at James and Lawrence Sts., Rome | Chesley, Earl & Heimbach, Inc. | 12/3/15 | 124,239 |
112 | Erie | Steel sheet-piling and slope protection with Contracts 60 and 66 | John Young | 4/24/13 | 120,519 |
113 | Erie | Timber for trough at Bushnell's Basin and Holley | Wm. J. Dowdle | 4/15/13 | 21,971 |
114 | Erie | Guard-gate above Lock 6, Waterford | Chas. A. Hager | 10/7/13 | 36,908 |
115 | Erie | Superstructure of Movable dam 4, Scotia | Penn Bridge Co. | 10/28/14 | 97,042 |
116 | Erie | Bridges at toll road and County line, Contract 46 | Walsh Construction Co. | 1/16/14 | 77,284 |
117 | Oswego | Bascule bridge over Lock 2, Fulton | Walter S. Rae | 4/15/18 | 32,299 |
118 | Erie | Bridge over Mohawk at Amsterdam | Lathrop, Shea & Henwood Co. | 7/29/14 | 154,611 |
119 | Erie | Driving steel sheet-piling cut-off and extending apron, Dam 5, Rotterdam | Holler & Shepard | 8/4/14 | 50,567 |
120 | Erie | Changes in Movable dams 5 to 11, inclusive, Mohawk river | Whitehead & Kales Iron Works | 7/29/14 | 382,026 |
121 | Erie | Superstructure of bridge at Sta. 2901 + 83, Contract 12 | General Erecting Co. | 7/8/14 | 9,110 |
122 | Erie | Highway bridge over Mohawk below Little Falls, Sta. 4246 + 42 | Thomas Leonard | 2/23/16 | 6,090 |
123 | Erie | Dam and sluice gate across West Canada creek at Trenton Falls | Frank L. Cohen | 5/11/14 | 17,530 |
125 | Erie | Viaduct over railroad at Vischer Ferry | Keith O. Guthrie | 8/31/14 | 39,178 |
126 | Champlain | Raising existing bridge at Mechanicville | Horseheads Construction Co. | 9/4/14 | 6,101 |
128 | Champlain | Highway bridge at Northumberland | Holler & Shepard | 5/27/16 | 75,189 |
129 | Erie | Freeman's bridge at Schenectady | The Foundation Co. | 6/6/16 | 82,202 |
130 | Erie | Improvement of Albany basin | Great Lakes Dredge & Dock Co. | 4/3/16 | 5,506 |
131 | Champlain | Bridge at Schuylerville | Spaulding Construction Co. | 3/28/16 | 850 |
131-A | Champlain | Completing bridge at Schuylerville | M. Fitzgerald | 3/5/17 | 37,916 |
132 | Erie | Lighthouses, buoys, etc., for Oneida and Onondaga lakes | Lupfer & Remick | 11/3/16 | 69,669 |
133 | Erie | Junction lock at Mohawk | Morrison & Quinn, Inc. | 10/16/16 | 42,435 |
135 | Erie | Excavating point below Dam 10, Canajoharie | Great Lakes Dredge & Dock Co. | 9/18/16 | 48,637 |
137 | Erie | Steel sheet-piling at Dam 10, Canajoharie | J.A. LaPorte | 10/13/16 | 17,866 |
139 | Oswego | Excavating channel below Lock 8, Oswego | Empire Engineering Co., Inc. | 11/3/16 | 17,837 |
140 | Champlain | Bank protection, Hudson river north of Waterford, Contract 71-A | Holler & Shepard | 11/1/16 | 4,856 |
144 | Erie | Red creek bridges, Genesee Valley park, Rochester | W.F. Martens & Co., Inc. | 6/14/17 | 6,580 |
144-A | Erie | Completing Contract 144 | Brown & Lowe Co. & Law Bros. | 8/27/19 | 67,733 |
145 | Erie | Raising existing Scotia Bridge, Schenectady. | Horseheads Construction Co. | 1/4/17 | 3,765 |
146 | Erie | New movable dam to replace Dam 14, Herkimer | Peckham Construction Co., Inc. | 4/18/18 | 89,934 |
147 | Erie | Bascule bridge, Main and Webster Sts., Tonawanda | Lathrop, Shea & Henwood Co. | 9/10/17 | 254,019 |
148 | Erie | Highway bridge across Lock 27, at Leach St., Lyons | Lathrop, Shea & Henwood Co. | 9/5/17 | 67,878 |
150 | Erie | Concrete apron below head gates at Vischer Ferry dam | Brown & Lowe Co. | 12/1/16 | 22,273 |
152 | Erie | Repairing Lock 35, Lockport | Lupfer & Remick | 11/15/19 | 119,597 |
153 | Erie and Oswego | Aids to navigation on Mohawk, Oneida, Seneca and Oswego rivers | R.B. Wing & Son | 2/28/17 | 4,389 |
154 | Erie | Additional Taintor gate at Lock 27, Lyons | Lupfer & Remick | 4/7/17 | 8,409 |
155 | Erie | Hoist for bulkhead gates, Vischer Ferry dam | Lupfer & Remick | 1/31/17 | 12,258 |
156 | Erie | Highway bridge across Wood creek near Sylvan Beach | Chesley, Earl & Heimbach, Inc. | 8/28/17 | 9,643 |
157 | Erie | Dam across old canal at Rome | Thos. Bowen | 4/20/17 | 5,954 |
158 | Erie and Oswego | Buoys and lamp posts for Mohawk, Oneida, Seneca and Oswego rivers | James McKinney & Son | 3/22/17 | 3,127 |
161 | Erie | Furnishing and delivering electric motors, etc. at Rochester | Lord Construction Co. | 8/3/17 | 16,687 |
162 | Erie | Drain across canal at Main St., Brockport | Charles A. Ingersoll | 3/27/17 | 6,456 |
164 | Erie | Completing work between Lyons and Newark, and dam at Macedon | Lathrop, Shea & Henwood Co. | 10/30/17 | 223,540 |
165 | Erie | Removing Montezuma aqueduct and completing excavation | Mohawk Dredge & Dock Co., Inc. | 11/23/17 | 146,114 |
167 | Oswego | Bascule bridge at Culvert St., Phoenix | Walter S. Rae | 10/13/17 | 28,425 |
168 | Champlain | Concrete guide piers near Locks 3, 5 and 6, Champlain canal | Bronk & Kimmey | 7/29/18 | 89,352 |
169 | Champlain | Temporary timber guide piers below Locks 3 and 6 | Holler & Shepard | 6/28/17 | 2,883 |
170 | Erie | Junction lock and excavation at South Greece | Cleveland & Sons Co. | 11/10/17 | 60,096 |
172 | Erie | Barrel buoys and lamp posts on Seneca, Clyde, Genesee and Tonawanda rivers | Lupfer & Remick | 3/15/18 | 13,819 |
173 | Erie | Lanterns for buoys, etc., on Seneca, Clyde and Genesee rivers | R.B. Wing & Son | 2/9/18 | 8,960 |
178 | Erie | Improvement of by-passes at Locks 32 and 33 | W.F. Martens | 3/12/18 | 47,272 |
179 | Erie | Completing excavation and incidental work near Pittsford | I.M. Ludington's Sons, Inc. | 11/9/17 | 91,409 |
180 | Erie | Removing Rexford Flats aqueduct | Dunbar & Sullivan Dredging Co. | 3/15/18 | 16,154 |
181 | Erie | Waterproofing canal bottom at Little Falls | Law Brothers | 12/28/17 | 48,223 |
182 | Oswego | Completing excavation in front of dockwall below Lock 8, Oswego | E. Brown Baker | 8/30/18 | 27,228 |
183 | Erie | Aligning bridge at W. Henrietta road, Rochester | Donnell-Zane Co. | 9/11/18 | 5,505 |
184 | Erie | Excavation under N.Y.C.R.R. bridge at Brewerton | Mohawk Dredge & Dock CO. | 4/12/18 | 9,563 |
185 | Erie | Channel improvement below dams at Scotia and Rotterdam | Am. P. & Const. Co. (R. Wetherill, Rec'r) | 6/24/18 | 151,541 |
187 | Erie | Bank protection between New London and Lock 22 | Scott Bros. | 8/20/18 | 15,585 |
188 | Erie | Completing excavation under Brewerton R.R. bridge | E. Brown Baker | 8/7/18 | 35,996 |
189 | Erie | Completing excavation and placing bank protection, Fairport to Kings Bend | Lathrop, Shea & Henwood Co. | 12/6/19 | 18,562 |
190 | Erie | Completing canal from Kings Bend to L.V.R.R. crossing, Rochester | Empire Engineering Co., Inc. | 3/20/19 | 244,307 |
191 | Erie | Completing work on Contract 59 in river south of temporary dam | Empire Engineering Co., Inc. | 1/14/19 | 155,023 |
192 | Erie | Completing work on Contract 59 in Genesee Valley park and east guard-lock to Genesee river | Brown & Lowe Co. | 1/22/19 | 593,286 |
194 | Champlain | Completing work on Contract 1-A, Crockers Reef to Fort Edward | Dunbar [original text says "Dunber"] & Sullivan Dredging Co. | 5/24/20 | 36,791 |
197 | Erie | Repairs to Dam 4 at Rotterdam | Stewart Bros. | 1/27/19 | 14,620 |
198 | Erie | Highway bridge below Lock 28-A, Lyons | Lupfer & Remick | 8/25/19 | 39,341 |
200 | Erie | Steel sheet-piling, etc., between Rochester and Lockport | Lupfer & Remick | 2/26/19 | 128,847 |
201 | Erie | Completing concrete lining at Cartersville and stream entrance near Knapp's bridge | I.M. Ludington's Sons, Inc. | 3/13/19 | 50,782 |
204 | Erie | Dam across old canal, Lexington Ave., Rochester | I.M. Ludington's Sons, Inc. | 3/19/20 | 3,168 |
205 | Oswego | Concrete spillway below Lock 3, Fulton | Scott Bros. | 3/20/21 | 40,465 |
206 | Erie | Raising bridge over Lock 33, Rochester | Groot Engineering Co., Inc. | 8/31/21 | 3,667 |
207 | Erie | Removing material from prism, Orr's bridge, east of Holley | Byron, Forman & Riggs, Inc. | 1/4/22 | 5,022 |
Total ...................................................................... | ................................... | ............ | $86,921,972 |
Con-
tract No. |
Canal | Description of work | Contractor | Date of contract |
Total con- struction cost, includ- ing altera- tions and extra work orders |
1-A | Champlain | Completing portion of Contract 1, Crockers Reef to Fort Edward | Holler & Shepard | 8/3/14 | $212,255 |
19-A | Erie | Redredging Contract 19 | Empire Engineering Co., Inc. | 11/3/16 | 240,923 |
21-A | Erie | Completion of Contract 21 | Walsh Construction Co. | 2/16/16 | 631,401 |
23-A | Erie | Completion of Contract 23 | Empire Engineering Co., Inc. | 5/20/16 | 984,058 |
29-A | Erie | Completion of Contract 29 | Eastover Construction Co., Inc. | 3/27/16 | 376,443 |
44-A | Erie | Completion of work at New London | Scott Bros. | 10/10/16 | 56,242 |
59 | Erie | Rochester harbor and connecting channel | MacArthur Bros. Co. | 11/3/16 | 1,900,868 |
63-A | Erie | Completion of Contract 63 | State Highway Const. Co. | 2/23/16 | 456,595 |
73-A | Champlain | Completion of Contract 73 | Great Lakes Dredge & Dock. Co. | 1/15/16 | 580,096 |
84 | Erie | Viaduct over the river at Clyde | Lupfer & Remick | 3/9/17 | 92,421 |
98 | Erie | Lift-bridge at Adams St. and removing bridge at Chapel St., Lockport | Tifft Construction Co., Inc. | 11/24/16 | 84,723 |
99 | Oswego | Bascule bridge at Minetto | Larkin & Sangster | 9/12/16 | 153,086 |
122-A | Erie | Completing Contract 122 | Chesley, Earl & Heimbach, Inc. | 3/8/17 | 81,717 |
138 | Erie | Movable dam, etc., at Rochester | Combined Construction Co. | 4/19/17 | 716,030 |
141 | Erie | New power-station at Lock 29, Palmyra | W.F. Maas & Son | 3/8/17 | 27,193 |
159 | Erie | Embankment between Newark and Palmyra and extending Ganargua creek spillway | I.M. Ludington's Sons, Inc. | 3/27/12 | 40,046 |
Total ...................................................................... | ................................... | ............ | $6,634,097 |
Con- tract No. |
Canal | Description of work | Contractor | Date of contract |
Engineer's preliminary estimate |
Contractor's bid |
202 | Erie | Completing excavation and placing protection, Genesee river, Rochester | James Stewart & Co., Inc. | 5/4/22 | .......... | $339,902 |
208 | Erie | Taintor gate at Baldwinsville dam | Troy Public Works, Inc. | 6/12/22 | .......... | 27,387 |
209 | Erie | Raising Maguire's bridge approach within limits of Contract 62 | .................... | .......... | $3,003 | .......... |
210 | Erie | Spillway at south end, movable dam, Herkimer | Mohawk Dredge & Dock Co. | 10/16/22 | .......... | 4,504 |
Total ...................................................................... | ................................... | ............ | $3,003 | $371,793 |
ITEMS | Totals |
Work completed exclusive of that done under chapter 585, Laws of 1918 ............... | $86,921,972 |
Work completed under chapter 5858, Laws of 1918 ............... | 6,634,097 |
Work under contract but uncompleted, October 18, 1922 ............... | 371,793 3,003 |
Special work: Completing Contracts 47-A and 63-A, relocating highways and miscellaneous extra work ............... | 2,724,305 |
Schenectady-Scotia bridge ............... | 500,000 |
------------ | |
$97,155,170 | |
Deduct bonds of the J.R. Shanley Estate Co., held by the Comptroller ............... | 469,000 |
------------ | |
Total .............................. | $96,685,570 |
Con- tract No. |
Canal | Description of work | Contractor | Date of contract |
Total con- struction cost, includ- ing altera- tions and extra work orders |
A | Cayuga and Seneca | Lock and dam at Cayuga | Scott Bros. | 12/30/10 | $352,845 |
A-1 | Cayuga and Seneca | Dam repairs and fish ladder at Dam 1, Cayuga | The Sherman-Stalter Co. | 7/24/16 | 24,750 |
B | Cayuga and Seneca | Montezuma to Cayuga lake, Cayuga lake to Seneca Falls, Waterloo to Seneca Falls | The Sherman-Stalter Co. | 12/29/10 | 1,313,169 |
C | Cayuga and Seneca | Locks, dams, etc., at Seneca Falls | Larkin & Sangster | 1/11/13 | 1,171,914 |
D | Cayuga and Seneca | Dredging Seneca river, Demont's bridge through Waterloo | The Sherman-Stalter Co. | 2/24/14 | 948,530 |
E | Cayuga and Seneca | Lock, dam, etc., at Waterloo | Cleveland & Sons Co. | 1/7/13 | 317,646 |
F | Cayuga and Seneca | Highway bridges at Lake road, Free bridge and Demont's | Stanley Construction Co. | 7/20/14 | 127,400 |
G | Cayuga and Seneca | Lock gates, valves, buffer-beams, needle-beam, Taintor and guard-gates, Locks 2, 3 and 4, dam 2 | Lupfer & Remick | 11/24/14 | 102,296 |
H | Cayuga and Seneca | Excavating Cayuga inlet at Ithaca | N.Y. State Dredging Corporation | 12/22/11 | 218,479 |
I | Cayuga and Seneca | Watkins to Montour Falls | The Central Dredging Co. | 9/23/12 | 187,350 |
J | Cayuga and Seneca | Bridge at Fourth St., and dockwall, Watkins | Chesley, Earl & Heimbach, Inc. | 11/27/14 | 45,122 |
K | Cayuga and Seneca | Highway bridges at Ovid and Bridge Sts., Seneca Falls, and Washington St., Waterloo | The Phoenix Bridge Co. | 10/30/14 | 60,480 |
L | Cayuga and Seneca | Highway bridges at Gorham St., Waterloo, and Kingdom road | Scott Bros. | 9/23/15 | 55,554 |
M | Cayuga and Seneca | Power-plants, equipment, etc., Locks 1,2,3 and 4 | Lupfer & Remick | 11/5/14 | 190,496 |
P | Cayuga and Seneca | Cut-off wall below walls of Lock 3, Seneca Falls | The Foundation Co. | 6/8/17 | 107,883 |
Q | Cayuga and Seneca | Pile dolphins on Cayuga and Seneca lakes | W. F. Martens | 3/3/19 | 5,092 |
R | Cayuga and Seneca | Completing unfinished work on Cayuga and Seneca canals | The Sherman-Stalter Co. | 4/30/18 | 173,434 |
T | Cayuga and Seneca | Extending core wall, Dam 2, Seneca Falls | Kennedy & Scullen Const. Co., Inc. | 1/20/19 | 18,721 |
U | Cayuga and Seneca | Repairing sewer in Benton creek, Seneca Falls | Smith-Soper | 1/3/19 | 5,148 |
W | Cayuga and Seneca | Placing fill along river bank above dam, Seneca Falls | J. B. Anglim | 3/5/21 | 4,461 |
------------ | ------------ | ||||
Total ........................................ | .............................. | ............... | $5,430,770 |
Con- tract No. |
Description of work | Contractor | Date of contract |
Total con- struction cost, includ- ing altera- tions and extra work orders |
1 | Dockwall at Ithaca | New York State Dredging Corporation | Aug. 21, 1912 | $40,535 76 |
2 | Dockwall at Albany | Raymond Concrete Pile Company | Aug. 30, 1912 | 140,474 79 |
2-P | Paving at Albany | Patrick W. Mulderry | Nov. 12, 1915 | 30,545 20 |
3 | Dockwall and grading, Little Falls | Ætna Engineering and Contracting Co. | Aug. 13, 1912 | 60,083 60 |
5 | Dockwall and grading, Mechanicville | E. Brown Baker | Sep. 4, 1912 | 52,210 94 |
6 | Dockwall and grading, Whitehall | Albert M. Banker | Nov. 22, 1912 | 46,995 70 |
7 | Dockwall and grading, Fort Edward | Aldrich & Hall, Inc. | Oct. 3, 1912 | 45,741 27 |
7-A | Approach channel and harbor, Fort Edward | New York State Dredging Corporation | Oct. 14, 1912 | 140,255 39 |
8 | Dockwall and grading, Schenectady | American Pipe and Construction Co. | Oct. 14, 1912 | 157,745 68 |
8-P | Paving at Schenectady terminal | James P. Kelly | April 15, 1918 | 8,452 69 |
9 | Dockwall and grading, Herkimer | Ætna Engineering and Contracting Co. | Oct. 2, 1912 | 65,192 51 |
10 | Dockwall and grading, Fonda | American Pipe and Construction Co. | Nov. 25, 1912 | 57,780 42 |
10-P | Paving, Fonda terminal | Patrick W. Mulderry | April 12, 1918 | 8,054 40 |
11 | Dockwall and grading, Ilion | Ætna Engineering and Contracting Co. | Nov. 25, 1912 | 54,728 79 |
12 | Dockwall and grading, Amsterdam | American Pipe and Construction Co. | Nov. 25, 1912 | 59,808 02 |
12-F | Fence along roadway approach, Amsterdam terminal | Anchor Post Iron Works | April 16, 1918 | 1,355 25 |
13 | Guard-lock and highway bridge, Schuylerville | Kendar Engineering & Construction Co. | Dec. 29, 1914 | * 78,283 37 |
14 | Dockwall and grading, lower terminal, Troy | Walsh Construction Co. | Jan. 16, 1914 | 125,337 11 |
15 | Lock channel, basin, dockwall and grading at Utica | Eastover Construction Company | Jan. 8, 1913 | 582,834 73 |
15-D | Drainage of terminal site at Utica | Mohawk Dredge & Dock Co., Inc. | Aug. 13, 1917 | 9,276 09 |
15-M | Lock machinery, Utica terminal | Lupfer & Remick | Oct. 31, 1917 | 37,069 72 |
16 | Dockwall and grading, Rome | M. A. Talbott Company | Nov. 19, 1912 | 86,715 32 |
16-P | Macadam pavement, Rome | E. Brown Baker | June 4, 1917 | 4,169 50 |
17 | Raising dockwall and laying stone block pavement, Lockport | John Johnson Construction Co. | Dec. 4, 1912 | 48,906 89 |
18 | Bulkhead and harbor at Gowanus bay | Geo. W. Rogers & Co., Inc. | July 15, 1914 | 323,204 40 |
19-P | Paving at Greenpoint and West 53d street | The Hastings Pavement Company | April 14, 1920 | 23,329 09 |
21-P | Paving, Erie basin, Buffalo | Henry P. Burgard Company | May 6, 1918 | 13,066 00 |
22 | Dockwall at Fort Plain | Leary & Morrison Co. | Mar. 31, 1913 | 22,839 44 |
23 | Pier at Plattsburgh | D.L. Taylor & Co. | Feb. 24, 1913 | 129,512 46 |
25 | Pier at Port Henry | New York State Dredging Corporation | Aug. 27, 1913 | 89,638 84 |
26-A | Completion of terminal at Rouses Point | Holler-LaDu Corporation | Nov. 11, 1920 | 28,739 40 |
27 | Dockwall at Frankfort | Ætna Engineering and Contracting Co. | Aug. 27, 1913 | 41,249 16 |
27-P | Paving, Frankfort terminal | Patrick W. Mulderry | April 12, 1918 | 3,938 45 |
28 | Dockwall and breakwater at Cleveland | Barrally & Ingersoll | Feb. 15, 1915 | 34,553 77 |
28-A | Protection of breakwaters at Cleveland | Eugene Dawley | Mar. 1, 1920 | 19,233 55 |
29 | Proposed dockwall and breakwater at Constantia | Barrally & Ingersoll | Nov. 27, 1914 | 3,400 00 |
30 | Dockwall, hydraulic canal wall and roadway approach, Oswego, river terminal | Henry P. Burgard | Mar. 24, 1916 | 101,789 20 |
33 | Lake pier at Oswego | Empire Engineering Co., Inc. | July 10, 1914 | 338,252 26 |
33-P | Paving at Oswego, lake terminal | Guy P. Dickison | May 7, 1918 | 11,329 00 |
34 | Dockwall at Thomson | Champlain Engineering and Construction Corporation | Aug. 20, 1914 | 16,128 06 |
35 | Dockwall at Crescent | Joseph P. Casey | Nov. 7, 1914 | 9,146 37 |
36-A | Dockwall extension and freight-house at Cohoes | Holler-LaDu Corporation | Nov. 28, 1919 | 40,469 40 |
37 | Dockwall, harbor and paving at Canajoharie | Holler and Shepard | Aug. 26, 1915 | 31,504 34 |
38 | Pier at West 53d street, New York city | I. J. Stander & Co., Inc. | Oct. 27, 1917 | 262,654 44 |
39 | Grading terminal site at Albion | Fred H. Rhodey | Mar. 19, 1917 | 2,718 40 |
40 | Dockwall, harbor and approach, St. Johnsville | Scott Bros. | Sept. 20, 1915 | 25,542 91 |
41 | Removing buildings and grading the terminal site at Troy, upper terminal | Eastern Storage Transfer & Wrecking Corp. | Nov. 29, 1918 | ‡ 480 80 |
42 | Paving at Long Island City terminal | Leonard Paving CO. | Nov. 13, 1918 | 47,313 05 |
43 | Dockwall, dredging, frame freight-house, Flushing | McHard-Barton Company | July 25, 1919 | 163,789 71 |
44 | Dockwall, Mott Haven | Geo. W. Rogers Co., Inc. | June 8, 1917 | 181,456 77 |
44-P | Pavement at Mott Haven, Greenpoint and Gowanus bay | Asphalt Construction Co. | May 13, 1919 | 79,720 38 |
45 | Constructing a terminal at Hallets Cove | Mohawk Dredge & Dock Co., Inc. | Nov. 28, 1919 | 281,591 41 |
46 | Dockwall at Weedsport | Scott Bros. | Aug. 31, 1915 | 11,702 37 |
47 | Dockwall and pavement, Tonawanda and North Tonawanda | I. M. Ludington's Sons, Inc. | Oct. 5, 1915 | 36,901 92 |
49 | Grading terminal at Spencerport | F. J. Mumm Contracting Co., Inc. | Oct. 8, 1915 | 1,354 30 |
50 | Grading terminal at Holley | Rhodey & Clawson | Nov. 12, 1915 | 807 75 |
51 | Dockwall and roadway approaches at Medina | Fred H. Rhodey | Feb. 16, 1916 | 4,862 83 |
52-P | Paving on Pier 6, East river, New York city | Sicilian Asphalt Paving Co. | June 13, 1919 | 11,252 00 |
54 | Grading terminal site, Middleport | Hammond-Tracey Construction Co., Inc. | Mar. 27, 1917 | 1,052 25 |
55 | Pier at Gowanus bay | Riverside Contracting Co. | Sept. 4, 1917 | 500,410 28 |
56 | Repairing Pier 5, East river, New York city | I. J. Stander & Co., Inc. | June 28, 1918 | 29,794 39 |
57 | Viaduct and approach to Rochester terminal | Chas. Kiehm | Feb. 25, 1919 | 93,883 71 |
58 | Building tracks and pavement at Troy, lower terminal | C. P. Boland & Co. | Dec. 2, 1918 | 19,481 57 |
59 | Approach tracks to pier, lake terminal, Oswego | W. F. Martens | May 6, 1918 | 5,391 41 |
60 | Railroad and crane tracks on pier, lake terminal, Oswego | W. F. Martens | May 6, 1918 | 9,119 00 |
61 | Approach tracks to Pier 1, Erie basin, Buffalo | Walsh Construction Co. | May 15, 1918 | 10,787 60 |
62 | Railroad and crane tracks on Pier 1, Erie basin, Buffalo | Walsh Construction Co. | May 15, 1918 | 10,641 45 |
63 | Pavement at Utica terminal | Harry W. Roberts & Co. | April 19, 1918 | 9,490 23 |
64 | Railroad and crane tracks at Schenectady | Robert Wetherill Receiver for American Pipe & Construction Co. | April 24, 1918 | 11,022.44 |
66 | Shore protection between Pier 2 and Lake street, Erie basin, Buffalo | Empire Engineering Co., Inc. | June 29, 1918 | 12,409 13 |
67 | Approach tracks to Pier 2, Erie basin, Buffalo | Walsh Construction Co. | July 3, 1918 | 6,959 60 |
68 | Railroad tracks on Pier 2, Erie basin, Buffalo | Walsh Construction Co. | July 3, 1918 | 6,270 30 |
69 | Shore protection between Lake street and Slip No. 1, Erie basin, Buffalo | Richard C. Bush | Feb. 27, 1919 | 8,475 53 |
70 | Razing buildings, Rochester | Geo. W. Chambers | April 9, 1919 | ‡ 3,500 00 |
71 | Completion of viaduct approach to Rochester terminal | I. M. Ludington's Sons, Inc. | Aug. 24, 1920 | 365,178 38 |
76 | Yard tracks, Erie basin, Buffalo | Mohawk Dredge & Dock Co. | Sept. 21, 1920 | 22,055 70 |
77 | Dredging, Piers 5 and 6, Greenpoint, Long Island City | New Jersey Shipbuilding & Dredging Co. | May 13, 1919 | 44,196 50 |
79 | Bulkhead wall and foundations for grain elevator, Henry street slip, Gowanus bay | Raymond Concrete Pile Co. | Oct. 21, 1920 | 377,699 68 |
80 | Concrete foundation piers of grain elevator, Oswego | Brown & Lowe and Law Brothers | Nov. 9, 1920 | 259,578 64 |
101 | Stiff leg derricks at Albany, Whitehall, Little Falls, Rome, Lockport and Tonawanda | Mohawk Dredge & Dock Co. | Dec. 18, 1916 | 39,577 95 |
102 | Semiportal cranes, Pier 6, East river | Edward F. Terry Mfg. Co. | Jan. 21, 1919 | 41,406 75 |
103-A | Package freight conveyors at Schenectady and Pier 5, New York | Brown Portable Conveying Machinery Co. | Oct. 3, 1917 | 10,102 60 |
104 | Electrical equipment, Greenpoint | T. Frederick Jackson, Inc. | June 10, 1920 | 22,611 78 |
105 | Electric wiring, scales, etc., at Pier 6 | Lord Electric Co. | June 28, 1918 | 19,395 96 |
106 | Tractor cranes at Erie basin, Buffalo, Tonawanda, Lockport (lower), Lyons, Syracuse, Oswego. Utica, Amsterdam, Schenectady, Troy, Pier 6, Long Island City | The John F. Byers Machine Co. | Feb. 14, 1918 | 77,210 00 |
107 | Electrical equipment, Erie basin, Buffalo | J. Livingston & Co. | Mar. 4, 1919 | 28,685 91 |
108 | Electrical equipment, Long Island City | T. Frederick Jackson, Inc. | Nov. 21, 1919 | 4,644 10 |
109 | Capstans and trolley hoists, Pier 6, East river, W. 53d St. and Utica terminal lock | General Electric Co. | Aug. 2, 1918 | 18,755 00 |
110 | Traveling wharf cranes, Pier 6, New York city, two Shaw 4-motor | Manning, Maxwell & Moore (Purchased by Superintendent of Public Works) | 23,885 00 | |
112 | Trailers and hand trucks, Pier 6, Greenpoint, Mott Haven | Lansing Company | July 23, 1919 | 9,250 00 |
113 | Capstans and trolley hoists, Greenpoint, Schenectady and Erie basin, Buffalo | General Electric Company | June 9, 1919 | 14,090 00 |
114 | Cranes, Erie basin, Buffalo | Heyl & Patterson, Inc. | Oct. 27, 1920 | 39,714 00 |
114-a | Furnishing and installing extension to boom of one of cranes at Erie basin, Buffalo | Heyl & Patterson, Inc. | May 29, 1922 | 1,300 00 |
117 | Motor generators and switchboards, Mott Haven and Greenpoint | Leonard Morey | June 20, 1919 | 5,292 52 |
124 | 5-ton full portal revolving jib crane at Troy | Walter H. Wilms | May 10, 1922 | 9,998 00 |
125 | 5-ton full portal revolving jib crane at Oswego | Walter H. Wilms | May 10, 1922 | 9,998 00 |
126 | Clam-shell buckets, New York city | Contractors Trading Co., Inc. | May 23, 1922 | 2,770 00 |
127 | Lifting magnet equipment, Troy and Mott Haven | K.I. Clisby | June 1, 1922 | 4,190 00 |
203 | Frame freight-houses at Troy, Mechanicville, Fort Edward and Port Henry | Collins Brothers | Dec. 29, 1916 | 8,485 68 |
203-P | Plumbing in freight-house, Troy | M.J. Flannery & Son | Dec. 26, 1919 | 673 00 |
204 | Frame freight-houses at Schenectady, Amsterdam, Fonda, Ilion and Frankfort | Kennedy & Scullen | Mar. 12, 1917 | 19,485 82 |
205 | Frame freight-houses at Utica and Rome | Wm. R. Kimmey | Mar. 14, 1917 | 13,665 43 |
206 | Frame freight-houses at Spencerport and Holley | J.B. McCabe & Son | Jan. 29, 1917 | 1,397 50 |
207 | Freight-house on Pier 6 | I.J. Stander & Co., Inc. | Jan 11, 1918 | 128,500 22 |
207-H | Heating system, freight-house on Pier 6 | Miller & Brady, Inc. | Mar. 22, 1918 | 2,664 26 |
207-P | Plumbing and water-supply systems, freight-house, Pier 6 | Jarcho Bros., Inc. | April 16, 1918 | 7,334 85 |
208 | Frame freight-houses at Fort Plain and Little Falls | Kennedy & Scullen Construction Co. | May 7, 1917 | 9,398 36 |
209 | Frame freight-houses at Tonawanda and North Tonawanda | G.J. & P.L. Metzger | June 4, 1917 | 7,542 64 |
210 | Frame freight-houses at Lockport (upper and lower sites) | Savage Construction Company | June 1, 1917 | 9,844 48 |
211 | Frame freight-houses at Newark, Albion and Median | W.F. Martens & Co., Inc. | June 14, 1917 | 8,044 28 |
212 | Permanent freight-house on Pier 1, Erie basin, Buffalo | Felton Construction Company | Nov. 14, 1918 | 196,847 74 |
212-H | Heating system, freight-house, Erie basin, Buffalo | Power Efficiency Corporation | Dec. 6, 1919 | 3,540 00 |
212-P | Plumbing, freight-house Pier 1, Erie basin, Buffalo | James J. Bresnahan | Dec. 6, 1919 | 3,322 00 |
213 | Frame freight-house and timber derricks at Syracuse | Savage Construction Co. | Feb. 14, 1918 | 26,718,22 |
214 | Frame freight-house and paving at Amsterdam | Kennedy & Scullen Construction Co. | April 26, 1918 | 15,044 02 |
216 | Frame freight-house on Pier 2, Erie basin, Buffalo | Savage Construction Co. | July 9, 1918 | 12,065 00 |
217 | Freight-house and crane-track, Long Island City, N. Jane St. | A. E. Norton, Inc. | Oct. 23, 1918 | 84,335 27 |
217-P | Plumbing system, freight-house, Long Island City, N. Jane St. | Altman Plumbing Co. | May 29, 1919 | 4,315 62 |
218 | Freight-house at West 53d street, New York city | Donnell-Zane Co., Inc. | May 13, 1919 | 45,592 66 |
219 | Freight-house at Gowanus bay | Snare & Triest Co. | April 30, 1920 | 606,879 81 |
219-H | Heating system, freight-house, Gowanus bay | George Gibson & Co., Inc. | June 1, 1921 | 4,509 80 |
219-P | Plumbing system, freight-house, Gowanus bay | Wm. Young Plumbing Co. | June 1, 1921 | 5,918 00 |
219-W | Water-supply system, freight-house, Gowanus bay | Thomas E. O'Brien, Inc. | Nov. 26, 1921 | 7,061 00 |
220 | Frame freight-house extension at Utica | James T. Young | Aug. 12, 1918 | 5,342 40 |
221 | Frame freight-house extension at Little Falls and frame freight-house at Herkimer | Kennedy & Scullen Construction Co. | Aug. 30, 1918 | 6,293 21 |
222 | Frame freight-house and depressed roadway at Canajoharie | J. A. LaPorte | Aug. 23, 1918 | 4,206 40 |
223 | Freight-house at Greenpoint | Post & McCord | Mar. 20, 1919 | 78,467 32 |
223-P | Plumbing system, freight-house, Greenpoint | Thomas E. O'Brien, Inc. | Sept. 10, 1920 | 10,395 00 |
224 | Freight-house at Mott Haven | Post & McCord, Inc. | July 29, 1920 | 147,442 31 |
225 | Head-house, West 53d St. pier, New York city | Fox, Reynolds Co., Inc. | Dec. 5, 1919 | 58,128 62 |
225-H | Heating, West 53d street head-house | Austin Engineering Co. | Nov. 12, 1920 | 5,119 00 |
226 | Frame freight-house, Oswego, river terminal | J. A. LaPorte | April 28, 1919 | 5,030 58 |
227 | Frame freight-house, Gowanus bay | J. A. LaPorte | April 28, 1919 | 9,305 20 |
228 | Frame freight-house, Rochester | W. F. Martens | Dec. 27, 1919 | 13,700 50 |
228-H | Extension to frame freight-house, Rochester | Henry B. Reed | April 5, 1921 | 9,531 85 |
229 | Foundation for permanent freight-house, Rochester | New England Foundation Co., Inc. | Nov. 11, 1920 | 30,651 46 |
232 | Freight-house at Brockport | F. W. & J. J. Crouch | Jan. 14, 1922 | 2,065 50 |
--------------- | ||||
Total ......................... | ......................... | ............... | $8,137,186 14 |
Notes:
* Work completed by Superintendent of Public Works.
† Date of compiling table.
‡ Paid to State.
Con- tract No. |
Description of work | Contractor | Date of contract |
Total con- struction cost, includ- ing altera- tions and extra work orders |
19 | Bulkhead and pier at Greenpoint | McHarg-Barton Company | Nov. 24, 1916 | $289,663 05 |
20 | Channel, harbor, piers, bulkheads and highway bridge at Syracuse | Walsh Construction Company | Nov. 4, 1915 | 645,883 55 |
21 | Piers and harbor, Erie basin, Buffalo | Empire Engineering Co., Inc. | Jan. 12, 1914 | 928,398 37 |
26 | Pier at Rouses Point | John E. Byron & Co. | Oct. 30, 1916 | 23,456 67 |
31 | Dockwall and frame freight-house at Lyons | Lupfer & Remick | Sept. 30, 1916 | 56,544 98 |
36 | Dockwall at Cohoes | Troy Public Works Company | Mar. 27, 1917 | 30,611 23 |
48 | Dockwall at Rochester | Michael H. Ripton | Oct. 19, 1916 | 94,766 44 |
52 | Repairing and extending Pier 6, East river, New York city | Kaufman and Garcey | July 27, 1916 | 135,004 70 |
53 | Dockwall and bascule bridge at Ohio basin, Buffalo | Walsh Construction Company | Oct. 27, 1916 | 496,420 19 |
201 | Permanent freight-houses at Albany and Whitehall | J.A. LaPorte | Jan. 2, 1917 | 84,270 66 |
--------------- | ||||
Total ........................... | .................... | ............ | $3,154,857 18 |
Con- tract No. |
Character of work | Contractor | Date of contract |
Contract price as modified by alterations |
53-A | Completing certain portions of dockwall, Ohio basin, Buffalo | Great Lakes Dredge & Dock Co. | Dec. 27, 1920 | $435,000 00 |
81 | Grain elevator at Gowanus bay | Fegles Construction Co., Ltd. | May 3, 1921 | 1,567,420 04 |
84 | Clarissa street approach, Rochester | I. M. Ludington's Sons, Inc. | Sept. 7, 1921 | 63,309 00 |
86 | Fences at Gowanus bay, Greenpoint and West 53d St., New York city | Leon Gottlieb Iron Works | Mar 18, 1922 | 8,782 50 |
87 | Fence at Little Falls terminal | American Fence Construction Co., Inc. | Mar. 14, 1922 | 4,093 25 |
88 | Paving, railroad and crane tracks, etc., Rochester Terminal | I. M. Ludington's Sons, Inc. | June 22, 1922 | 123,240 00 |
89 | Paving, railroad and crane tracks, electrical work, etc., Syracuse terminal | J. H. Gallup | July 28, 1922 | 59,609 00 |
90 | Dredging Henry street slip, Gowanus bay | Taylor Dredging Co. | Aug 1, 1922 | 19,085 00 |
115 | Power equipment, Gowanus bay | The Croker National Fire Prevention Engineering Company, Inc. | Jan. 7, 1922 | 57,359 99 |
116 (Revised) |
Semiportal cranes, W. 53d St. and Greenpoint, New York city | Shepard Electric Crane & Hoist Co. | Jan. 16, 1920 | 56,280 00 |
118 | Semiportal cranes, Gowanus bay | Lambert Hoisting Engine Co. | Oct. 11, 1921 | 25,590 00 |
119 (Revised) [original text has 199] |
Burtoning cranes, Mott Haven | Lambert Hoisting Engine Co. | Oct. 11, 1921 | 11,980 00 |
120 | Cranes at Rochester | The McMyler Interstate Co. | Jan. 21, 1922 | 16,230 00 |
122 | 5-ton traveling bridge cranes, one each at Rochester and Syracuse | Penn Bridge Co. | May 9, 1922 | 58,300 00 |
128 | 5-ton full portal revolving jib crane, Erie basin, Buffalo | Walter H. Wilms | July 22, 1922 | 9,998 00 |
129 | Lifting magnets, Schenectady; also Gowanus bay, Mott Haven, Greenpoint and Pier 6, New York city | K. I. Clisby | Aug. 29, 1922 | 9,590 00 |
130 | Lifting magnets, Pier 2, Erie basin, Buffalo | Electric Controller & Mfg. Co. | Aug. 26, 1922 | 4,512 10 |
131 | Four 20-ton auto truck scales, Gowanus bay, Greenpoint, Mott Haven, Long Island City | The Fairbanks Co. | Sept. 12, 1922 | 8,364 25 |
132 (Revised) |
One 5-ton full portal revolving jib crane at Mott Haven | Walter H. Wilms | Sept. 25, 1922 | 9,998 00 |
133 | One 5-ton full portal revolving jib crane, Ohio basin, Buffalo | Walter H. Wilms | Sept. 11, 1922 | 9,998 00 |
134 | One 5-ton full portal revolving jib crane, Syracuse | Walter H. Wilms | Sept. 11, 1922 | 9,998 00 |
135 | Generator sets, one each at Albany and Troy | K. I. Clisby | Aug. 29, 1922 | 3,000 00 |
136 | Steel tanks, 23 at Waterford | K. I. Clisby | Aug. 29, 1922 | 3,525 00 |
138 | Locomotive crane, Long Island City | W. H. Wilms | Sept. 20, 1922 | 8,000 00 |
230 | Permanent freight-house at Rochester | W. F. Martens | July 7, 1921 | 182,399 25 |
230-H | Heating, Rochester freight-house | L. C. Gresens | Dec. 20, 1921 | 7,295 00 |
230-P | Plumbing, Rochester freight-house | Arensmeyer, Warnock & Aahrndt, Inc. | Dec. 17, 1921 | 4,177 00 |
233 | Extension of pier shed West 53d street, New York city | McHarg-Barton Co. | June 8, 1922 | 51,355 00 |
--------------- | ||||
Total .............................. | .............................. | ............... | $2,828,488 38 |
ITEMS | Totals |
Work completed up to October 18, 1922, exclusive of that done under chapter 585, Laws of 1918 | $8,137,186 14 |
Work completed under chapter 585, Laws of 1918 | 3,154,857 18 |
Work under contract but uncompleted October 18, 1922 | 2,828,488 38 |
-------------------- | |
Total .................................................. | $14,120,531 70 |